New build: Delikant Feinkost food business
Industrial & Commercial Construction

New build: Delikant Feinkost food business

Rellingen · Completed 2025

The project

We carried out a comprehensive project for Delikant Feinkost GmbH at its Rellingen site: as the main contractor, we were responsible for the construction of just under 5,000 square metres of production and storage space – from the initial site survey right through to the turnkey handover. The existing facility had grown organically and was increasingly reaching its economic limits: production was spread across two floors, goods flow routes crossed one another, and the storage areas could no longer keep pace with the increased order volume.

Existing and new buildings intelligently connected

Together with the client and the architectural practice involved, we developed a concept that cleverly integrates the existing building with the new development. The administration block, dating from the 1960s, was deliberately retained: rather than demolishing it and building a new structure, the decision was made to carry out a comprehensive refurbishment, bringing its energy efficiency up to current standards. This conserves resources, preserves the site’s long-established identity – and underlines the principle of sustainability that runs through the entire project.

Hygiene and technology are strictly separated

A new building was constructed for production and storage, which was designed from the outset to meet the high standards of the food industry. Special hygienic flooringwith an integrated drainage system allow for daily wet cleaning without compromise; joint-free wall and ceiling systems prevent contamination; and the significantly increased ceiling height provides scope for future plant engineering. All transitions between the hygiene zones have been designed to ensure that the flow of personnel and goods remain clearly separated.

A central element of the design is the separate technical level above the production area: The entire technical infrastructure – ventilation, refrigeration distribution, utility routing – is located above the production areas and is accessible for maintenance work without entering the hygiene zone. This minimises production downtime, and regular inspections can be carried out whilst operations are ongoing.

Energy: Cooling that works twice as hard

Building services engineering was an integral part of our contract. At the heart of the system is an eligible refrigeration system that operates exclusively with the natural refrigerants CO₂ and propane – future-proof in the face of the F-gas Regulation and significantly more efficient than conventional systems. The waste heat from the refrigeration process is not discarded, but is collected in a 36,000-litre buffer tank and intelligently reused: for hot water supply throughout the premises and for the energy-intensive night-time cleaning processes.

Short distances, continuous production, measurable results

From a logistical perspective, the new building brings a significant improvement: for the first time, production and warehousing are under one roof and on the same level. Order picking takes place directly from the temperature-controlled warehouse, whilst loading takes place via new, thermally separated docking stations. This has significantly reduced lead times and internal transport – customer orders can be fulfilled more quickly and flexibly.

Production continued uninterrupted at the old site throughout the entire construction period. The relocation phases were planned in stages in collaboration with the client, ensuring that delivery capacity was never compromised. As the main contractor, we coordinated all trades – from structural work through to panel construction and refrigeration and building services – with a single point of contact for the client.

The result is a facility that combines cost-effectiveness, hygiene and sustainability – whilst offering scope for further growth: space for future expansion has already been factored into the plans, and the technical infrastructure is designed to accommodate additional systems. A project that demonstrates what turnkey food production facilities from a single source can achieve.

„In Plattenhardt + Wirth, we had a specialist firm at our side which worked with us in a spirit of partnership and with a focus on finding solutions to meet the requirements of our new production facility.“

— Hannah Pohlmann, Managing Director